News

News about Swistec and the Industry

Digitalisierung der Stromnetze des EW Fehraltorf

Elektroautos, Photovoltaikanlagen und Wärmepumpen. Eines ist klar: Die Energieflüsse im Verteilnetz ändern sich. Um sich genau für diese neuen Herausforderungen zu rüsten, haben sich die Gemeindewerke Fehraltorf entschieden, mit der

Swistec load management for Ghana

The grid operators in Ghana face some challenges. As there is little industry, the consumption peak is in the evening – as in many African countries – and generates a

Swistec is ISO 9001/14001 certified

We have met the requirements for a quality and environmental management system and have been certified on 13. August 2020. Through the certification we have created a valuable basis that

Controller unit RKS and transmitter SRS or SFU-K “talk” to each other

Our ripple control systems work reliably and efficiently. For the evaluation of this efficiency, the RKS transmits all stored alarms, events and measurement values to the connected PC. The ripple

Samuel Enggist new Chairman of the Board of Directors

Samuel Enggist takes over from Charles Keusch as Chairman of the Board of Directors of Swistec Systems AG. Charles Keusch has been closely involved with Swistec Systems AG since 2011

Newsletter October 2015 (German only)

This content is not available in English. Thank you for your comprehension. In diesem Newsletter zeigen wir Ihnen, wie Sie die Breitband Powerline-Technology problemlos für das Smart Grid einsetzen können

Swistalk no 11, May 2015 (German only)

This content is not available in English. Thank you for your comprehension. Swisstalk: “Worüber Endverbraucher Heute und morgen auch noch sprechen” Die Versorgungssicherheit unseres Stromnetzes ist uns allen ein grosses

Newsletter March 2015 (German only)

This content is not available in English. Thank you for your comprehension. Wir freuen uns, Ihnen hiermit den ersten Swistec Newsletter des Jahres 2015 zu präsentieren. Interessante Themen erwarten Sie: